Kura Revolving Sushi Bar
Japanese revolving sushi bar chain opening at The Square at Lotis Wellington. Features conveyor belt sushi service with colorful plates and robot delivery system.
Sant Ambroeus
Sant Ambroeus, offering Milanese fare and decadent pastries, will occupy 7,000 square feet at The Fifth Miami Beach luxury office building. The restaurant serves breakfast, lunch, and dinner with pizzas, salads, pastas, and veal Milanese, famous for their signature chocolate mousse cake.
SunLife Organics
Organic cafe offering healthful smoothies, superfood smoothies, açaí bowls, and matcha. This will be the first West Palm Beach location and second South Florida location for the chain.
Cluck Face Nashville Hot Chicken
Fast casual Nashville hot chicken restaurant opening at The Square at Lotis Wellington. Owned by husband and wife team David and Nancy Chapman, veteran restaurateurs planning multiple Florida locations. Menu features chicken tenders with various heat levels and customization options.
Buc-ee’s
New Buc-ee’s convenience store and gas station location with 120 fuel pumps and 76,245 square feet. Article clarifies it will not be the largest Buc-ee’s despite rumors.
Moxies
Premium casual restaurant opening its 10th U.S. location and 3rd Florida location in CityPlace. Features chef-driven cuisine, signature cocktails, statement bar, and private dining area. Currently hiring staff.
AVRA Estiatorio
AVRA Estiatorio will occupy ground-floor restaurant space in the LOFTY Brickell tower at One Brickell Riverfront development
Hilton at Okan Tower
316-key five-star Hilton hotel within the 72-story Okan Tower mixed-use development. Part of larger project including condo-hotel units and luxury residences. Construction currently at 40th floor.
Sense28
AvantStay hotel with 52 modern units including one- and two-bedroom suites with full kitchens, pool deck, fitness center, garage parking, and staffed lobby. Located in Miami’s Edgewater neighborhood, designed for group travel and extended stays.
Okan Tower Hilton
70-story mixed-use tower with 316-key Hilton hotel, 236 condo-hotel units managed by Hilton, 163 condos, 80,000+ sq ft amenities, 56,000 sq ft office space. Currently on 40th floor of construction, will be 903 feet tall when completed.